Skip to content
SunRun

Integrated IT solutions

Virtualization

Servers, storage, networking, platform software, backup, and migration planning aligned with workloads and licensing.

Infrastructure challenge

Virtualization may be relevant for fragmented server workloads, difficult resource allocation, or a need for more flexible infrastructure administration. Suitability, economics, and migration approach are determined after analysis; zero downtime is not promised.

Who it may suit

  • IT teams managing server workloads
  • Organizations refreshing compute infrastructure
  • Sites with multiple application systems

What the solution may include

  1. 1

    Compute nodes

    Resources reflect workloads, headroom, and placement conditions.

  2. 2

    Storage and networking

    The architecture considers access, bandwidth, and dependencies.

  3. 3

    Platform and licensing

    The software model is aligned with technical and licensing requirements.

  4. 4

    Backup and administration

    Protection and monitoring are planned as separately agreed components.

Relevant equipment directions

Relevant equipment directions

Servers and storage

Servers and storage prepared for the selected architecture.

Network and telecommunications

Switching and connectivity between nodes.

Software

Platform, infrastructure, and backup software.

Power and electrical equipment

Power and protection for server nodes.

Implementation stages

  1. 01

    Inventory

    We record workloads, dependencies, software versions, and current resources.

  2. 02

    Assess suitability

    We review compatibility, licensing, and migration constraints.

  3. 03

    Architecture

    We align compute, storage, networking, administration, and backup.

  4. 04

    Prepare and migrate

    Work follows the agreed plan and permitted windows.

  5. 05

    Verify and hand over

    We verify agreed functions and hand over documentation.

Implementation variants

  • New virtual environmentInfrastructure is shaped for the agreed workloads.
  • Phased migrationWorkloads move in groups with separate verification.
  • Existing-environment expansionResources are added after platform compatibility review.

Expected practical result

The intended result is more structured resource allocation, a consolidated administration plane, and a prepared workload plan. Savings, continuity, and scalability depend on the architecture and are not guaranteed.

Additional services

  • Workload inventory
  • Compatibility assessment
  • Migration planning
  • Documentation and administrator handover

Discuss virtual infrastructure

Describe current servers, applications, dependencies, resource, storage, network and licensing requirements, and acceptable migration windows.

Essential

Language, theme, consent preference, core security, and requested form protection.

Always enabled

Privacy policyCookies policy